Customization: | Available |
---|---|
Material: | Nylon |
Capability: | Heat-resistant Rubber Hose |
Still deciding? Get samples of US$ 0.01/Meter
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Factory direct supplying SAE 100R8 Hydraulic Hose
Tube:Oil-resistant synthetic thermoplastic core(Nylon)
Reinforcement:Two braids of high tensile synthetic fiber
Cover: Abrasion-resistant polyurethane
Temperature: -40°C to +100°C
Application:Automobile, construction machinery, lathe, agriculture machine, mining, Spurting the oil paint, avigation & spaceflight, cooling, and another hydraulic control system.
Application
Nominal Diameter |
Inside Diameter |
Outside Diameter |
Work Pressure |
Proof Pressure |
Burst Pressure |
Bend Redius |
Weight |
|
inch | mm | mm | bar | psi | bar | bar | mm | kgs/m |
4/25 | 3.4-4.0 | 10.5 | 420 | 6090 | 840 | 1680 | 25 | 0.073 |
3/16 | 4.6-5.4 | 14.6 | 350 | 5075 | 700 | 1400 | 90 | 0.086 |
1/4 | 6.2-7.0 | 16.8 | 350 | 5075 | 700 | 1400 | 100 | 0.097 |
3/8 | 9.3-10.3 | 20.3 | 280 | 4060 | 560 | 1120 | 125 | 0.178 |
1/2 | 12.3-12.5 | 24.6 | 245 | 3555 | 490 | 980 | 180 | 0.216 |
5/8 | 15.5-16.7 | 29.8 | 192 | 2785 | 384 | 768 | 205 | 0.312 |
3/4 | 18.6-19.8 | 33.0 | 157 | 2277 | 314 | 628 | 240 | 0.360 |
1 | 25.0-26.4 | 38.6 | 140 | 2030 | 280 | 560 | 300 | 0.505 |
Manufacturing Technique
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white wearable woven bags. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 20 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5.Do you have quality certificate?
A: Yes, we have ISO, SGS, CE and related test report.
Q6.How long can you guarantee the goods?
A: We guarantee the goods one year.
Q7.Do you test all your goods berore delivery?
A: Yes of course, we have 100% burst pressure test and impulse tests before delivery.