Material: | Nitrile Rubber |
---|---|
Capability: | Rubber Oil Hose |
Color: | Black |
Samples: |
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Factory direct supplying Hydraulic Rubber Hose SAE 100r17
Tube: Oil resistant synthetic rubber
Reinforcement: One or two high tensile steel wire braid
Cover: Oil, abrasion and weather resistant synthetic rubber
Temperature range: -40 ºC to +100 ºC
Application
DN | Size | SAE | Inside mm |
Outside mm |
Working Pressure |
Burst Pressure |
Bend Radius |
Weight | Length | ||||
mm | Inch | Dash | Min | Max | Max | Bar | Psi | Bar | Psi | mm | Kg/m | m | |
6 | 6.3 | 1/4" | -4 | 6.2 | 7.0 | 13.2 | 210 | 3045 | 840 | 12180 | 50 | 0.18 | 50/100 |
8 | 8 | 5/16" | -5 | 7.7 | 8.5 | 15.0 | 210 | 3045 | 840 | 12180 | 55 | 0.21 | 50/100 |
10 | 10 | 3/8" | -6 | 9.3 | 10.1 | 17.0 | 210 | 3045 | 840 | 12180 | 65 | 0.28 | 50/100 |
13 | 12.5 | 1/2" | -8 | 12.3 | 13.5 | 21.1 | 210 | 3045 | 840 | 12180 | 90 | 0.47 | 50/100 |
16 | 16 | 5/8" | -10 | 15.5 | 16.7 | 25.9 | 210 | 3045 | 840 | 12180 | 100 | 0.80 | 50/100 |
19 | 19 | 3/4" | -12 | 18.6 | 19.8 | 30.3 | 210 | 3045 | 840 | 12180 | 120 | 0.94 | 50 |
25 | 25 | 1" | -16 | 25.0 | 26.4 | 38.6 | 210 | 3045 | 840 | 12180 | 150 | 1.35 | 50 |
Exhibitions with Clients
Manufacturing Technique
Packaging and Shipping
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white wearable woven bags. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 20 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5.Do you have quality certificate?
A: Yes, we have ISO, SGS, CE and related test report.
Q6.How long can you guarantee the goods?
A: We guarantee the goods one year.
Q7.Do you test all your goods berore delivery?
A: Yes of course, we have 100% burst pressure test and impulse tests before delivery.
Suppliers with verified business licenses